Otter Tail Power contractor requirements: safety, prequalification and insurance
Otter Tail Power serves rural western Minnesota and parts of the Dakotas. It evaluates contractors on safety performance and cybersecurity as well as price, and its contracts carry their own insurance exhibit.
Otter Tail Power operating companies we can help with
- Otter Tail Power: Minnesota
What Otter Tail Power expects from contractors
Contractor evaluation criteria
Otter Tail evaluates contractors on quality, experience, cost, safety performance and adherence to cybersecurity requirements, and expects contractors to meet or exceed all OSHA requirements. Source.
Contractor Safety Policy
Otter Tail's Contractor Safety Policy (February 15, 2024) is its contractor orientation manual and covers worksite safety rules and contractor conduct; contractors who violate it can be asked to leave the job site. Source.
Bidders certify the safety policy
In Otter Tail RFPs, bidders certify they are aware of its Contractor Code of Business Ethics, Human Rights Policy and Contractor Safety Policy. Source.
Insurance exhibit in the MSA
Otter Tail's master service agreement template includes a separate insurance requirements exhibit (Exhibit C) and federal flow down terms for grant funded work. Source.
Insurance notes for Otter Tail Power contractors
- Read Exhibit C of the Otter Tail MSA and send it to us; we will match limits and endorsements line by line.
- Grant funded projects can bring federal flow down requirements to subcontractors too.
- TAKKEL is licensed in Minnesota; North Dakota and South Dakota are outside our current footprint.
Every utility contract has its own insurance exhibit. Send it to us with your current declarations pages and we will check limits and endorsements line by line: check my current coverage, or try the MSA requirements checker.
Questions contractors ask
What does Otter Tail look at when hiring contractors?
Can TAKKEL insure contractors working for Otter Tail Power?
Sources
- Otter Tail Power: contractors
- Otter Tail Contractor Safety Policy (2024)
- Otter Tail wood pole RFP (2025)
- Otter Tail MSA template
Checked November 2026. Utility requirements change; confirm current requirements with the utility and your contract.